Echigo Tokimeki Railway Express No. 1 & 2 Round-Trip Real-Time Record between Itoigawa & Ichibri

The tunnel sections are also recorded at a constant speed. You can jump to each point using the INDEX.

00:00 Omanta Festival Float Drumming
00:47 Express No. 1 Arrives at Itoigawa Station (Akakura Headmark)
01:29 Departure
03:36 Himekawa Railway Bridge Slowdown (In-car announcement: Himekawa commentary)
06:33 Tamigawa Railway Bridge
07:18 Passing Aomi Station (Himekawa headmark on a different day)
08:27 Slowdown at Katsuyama (In-car announcement: Oyashirazu commentary)
09:21 Shinkoshirazu Tunnel
12:24 Passing Uta Village and Oyashirazu Station
13:15 Second Sotoba Tunnel
13:38 Sotoba Village
13:44 First Sotoba Tunnel
14:35 Running parallel to the Hokuriku Expressway (Slowdown)
15:03 JR Freight 3097 Passing
15:10 Namiki Tunnel
15:28 Running parallel to National Route 8
15:37 Kazenami Tunnel
15:58 Glimpse of the spot
16:00 Oyashirazu Tunnel
19:11 Ichiburi settlement, overpass
19:39 Arrive at Ichiburi Station
20:03 Destination sign change
20:24 Pointing and confirming before departure
20:46 Local train arrives
21:04 Scenes from the stop
21:45 In-car sales menu
22:00 Depart Ichiburi Station
23:36 Oyashirazu Tunnel
27:15 Running parallel to National Route 8
27:33 Running parallel to Hokuriku Expressway, explanation
28:04 First Sotoba Tunnel
29:33 Running parallel to National Route 8 and Hokuriku Expressway
30:30 Koshirazu, Fukaya, Katsuyama Tunnel
32:50 Katsuyama scenery
34:45 Passing Aomi Station
37:08 High-speed crossing of Himekawa Railway Bridge The motor roars.
39:54 Arrived at Itoigawa Station

Leave a Reply

Your email address will not be published. Required fields are marked *

CAPTCHA


This site uses Akismet to reduce spam. Learn how your comment data is processed.